Departmental building codes VSN 123-90
"Instructions for the preparation of acceptance documents for electrical work"
(approved by the USSR Ministry of Montazhspetsstroy December 24, 1990)
(Instead of VSN 123-79)
devices and electrical substations up to 35 kV
up to 35 kV inclusive
for the delivery and acceptance of electrical work
1.1. Uniform forms of acceptance documentation for electrical installation work are being established.
1.2. Unified forms of acceptance documentation cover all types of electrical installation work, which are subject to the requirements of SNiP 3.05.06-85 "Electrical devices", and the restrictions imposed by order of the Minmontazhspetsstroy N 200 dated 06.19.85 - on the procedure for performing certain types of installation and special construction works in accordance with the profile of the organizations of the Ministry.
The instruction does not apply to the preparation of acceptance documents:
For electrical work in electrical installations and electrical networks with voltages above 35 kV ;
For revision, drying and repair of electrical equipment *;
For the installation of electrical machines *;
For the installation of contact networks of industrial and urban electrified transport .
1.3. Comprehensive acceptance of equipment as a whole, including electrical equipment, is carried out by a working commission appointed by the customer (developer), while an act of the working commission is drawn up on the acceptance of equipment after individual testing (Appendix 1 to SNiP 3.01.04-87).
The act formalizes the transfer to the customer of the equipment of the entire facility or for individual installations at large and complex facilities. The act also verifies that the equipment meets the acceptance requirements for its comprehensive testing.
1.4. According to clause 16 of SNiP 3.01.04-87, detached tasks and structures, built-in or attached premises for production or auxiliary purposes, if it is necessary to put them into operation during the construction of an object, are accepted into operation by working commissions as soon as they are ready, followed by their presentation to the State Acceptance Commission hosting the object as a whole.
1.5. The readiness of the completed electrical work for delivery and acceptance is determined by the act of technical readiness of electrical work ( ), which is the basis for organizing the work of the working committee for the acceptance of equipment after individual tests. The act of technical readiness can be used to formalize the delivery and acceptance of electrical work, when the working commission has not yet been formed.
1.6. Completed acceptance forms as part of all documentation listed in , after drawing up an act of technical readiness for electrical work (form 2), they are transferred to the general contractor for subsequent presentation to the working commission for the acceptance of equipment after individual tests; upon completion of the work of the commission and drawing up the corresponding act, the completed documentation, together with the electrical equipment, is transferred to the customer.
Documentation on commissioning works is presented to the commissions for the acceptance of equipment after individual tests and when drawing up an Act of technical readiness for electrical work. The documentation is kept by the customer or the commissioning organization.
1.7. The composition of the electrical equipment of electrical installations, drawn up by acts of technical readiness for electrical work, depends on specific conditions and can be determined, for example:
The boundaries of the technological unit;
The boundaries of the design brand or the main set of working drawings of working documentation (electrical substations - EP, electric lighting - EO, power electrical equipment - EM, etc.);
The boundaries of the shop, built-in, attached and detached premises and structures (power supply of temperature and humidity systems - TVR, electrical equipment of the premises of electric welding stations, compressor stations, etc.);
Electrical rooms, as well as electrical equipment that is part of technological systems (if its installation is carried out by an electrical installation organization).
In order to reduce the spelling, the complexes listed above are summarized by the term - electrical equipment of an electrical installation.
1.8. Records in the forms of acceptance documents must be clear and clear without blots and erasures. If you need to make changes, you should cross out the unnecessary and make the correct entry next to it.
1.9. When filling out the protocols and acts in the column "Result" or similar, the following should be indicated:
"norm" - if, when assessing the general condition of the elements of an electrical installation by external examination, the quality of the installation, the operation of mechanical interlocks, the simultaneous closing and opening of contacts, etc. no deviations;
"produced" - in the case of performance of test inclusions, adjustments, test inserts of withdrawable equipment elements;
"good" ("good") - when filling in the "conclusion" column, if the parameters of the apparatus or line during inspections and checks correspond to the technical conditions.
2.1. General forms of acceptance documentation reflect the main stages of electrical installation work, which are determined by SNiP 3.05.06-85, SNiP 3.01.01-85 and SNiP 3.01.04-87; common forms of documents include:
a) a list of technical documentation presented during the delivery and acceptance of electrical work ( );
b) an act of technical readiness for electrical work ( );
c) a list of changes and deviations from the project ( );
d) a list of electrical imperfections that do not interfere with complex testing ( );
e) act of acceptance and transfer of equipment for installation ( );
f) act on detected equipment defects ( );
g) list of installed electrical equipment ( );
h) the act of readiness of the building part of the premises (structures) for the production of electrical work ( ).
2.2. A certificate of elimination of deficiencies is not included in the technical documentation and is handed over to the customer separately.
2.3. Technical documentation for the delivery and acceptance of electrical work, completed in accordance with Form 1, together with an act of technical readiness for electrical work (Form 2), is transferred to the general contractor; it is an annex to the certificate of acceptance of equipment after individual tests.
2.4. An act of technical readiness for electrical work (Form 2) formalizes the readiness of electrical work for presentation to the working commission for the acceptance of equipment after individual tests.
2.5. The act of technical readiness (Form 2) is used to draw up (if necessary) the delivery and acceptance of the electrical installation to the general contractor to ensure the safety of completed electrical work, as well as for the delivery and acceptance to the customer (general contractor) of the components of the electrical installation (electrical lighting, cable lines, power lines, etc.) .p.) in temporary operation.
2.6. The certificate of acceptance and transfer of equipment for installation is drawn up according to the standard interdepartmental form M-25, approved by order of the Central Statistical Administration of the USSR N 628 of 11/27/85. Columns and lines of the form, circled in bold lines, include data for automated processing (not used for manual processing).
The same order of the Central Statistical Administration of the USSR introduced form M-27 of the Act on the identified equipment defects. An act is drawn up in cases where equipment defects are identified during installation, commissioning and testing. The need for revision and drying of electrical equipment is formalized by this act.
Acts on forms M-25 and M-27 are prepared by the customer with the participation of installers.
2.7. List of installed electrical equipment ( ) is used as an appendix to the Act of technical readiness for electrical work ( ).
2.8. Act on the readiness of the construction part of the facility (premises, structures) for the production of electrical work is formalized.
Appendix 2To technical readiness from
"_____" __________________ 200___
Bulletin
technical documentation presented
upon delivery and acceptance of electrical work
Download the file to continue reading ...
INSTRUCTIONS FOR REGISTRATION
ELECTRICAL WORKS
VSN 123-90
MMSS USSR
MOSCOW 2001
MINISTRY OF INSTALLATION AND SPECIAL
CONSTRUCTION WORKS OF THE USSR
DEPARTMENTAL BUILDING STANDARDS
INSTRUCTIONS FOR REGISTRATION
ACCEPTANCE DOCUMENTATION
ELECTRICAL WORKS
VSN 123-90
MMSS USSR
MOSCOW 2001
Instructions for the preparation of acceptance documents for electrical work covers the types of work that are subject to the requirements of SNiP 3.05.06-85 "Electrical devices", in terms of electrical installations and electrical networks with voltages up to 35 kV inclusive, carried out by organizations of the USSR Ministry of Montazhspetsstroy.
The instruction complies with the requirements of SNiP 3.01.01-85, SNiP 3.01.04-87, SNiP 3.05.06-85 and PES-85 (6th edition).
Instructions for drawing up acceptance documents for electrical installation work were developed by the All-Union State Research and Design Institute VNIIProektelektromontazh of the Ministry of Installation and Construction Works of the USSR.
With the entry into force of this Instruction, the “Instruction for the preparation of acceptance documents for electrical work” is canceled.
1. GENERAL PROVISIONS
1.1. Uniform forms of acceptance documentation for electrical installation work are being established.
1.2. Unified forms of acceptance documentation cover all types of electrical installation work, which are subject to the requirements of SNiP 3.05.06-85 "Electrical devices", and the restrictions introduced by the order of the Minmontazhspetsstroy No. 200 dated 06/19/85 - on the procedure for performing certain types of installation and special construction works in accordance with the profile of the organizations of the Ministry.
The instruction does not apply to the preparation of acceptance documents:
For electrical work in electrical installations and electrical networks with voltages above 35 kV 1;
For revision, drying and repair of electrical equipment 1;
For the installation of electrical machines 1;
For the installation of contact networks for industrial and urban electrified transport 2.
1 The installation organizations of the USSR Ministry of Montazhspetsstroy do not perform the specified work.
2 Acceptance documentation for the installation of contact networks is determined by the requirements of the "Instructions for the installation of contact networks of industrial and urban electrified transport" VSN 13-77 / ММССС USSR.
1.3. Comprehensive acceptance of equipment as a whole, including electrical equipment, is carried out by a working commission appointed by the customer (developer), while an act of the working commission is drawn up on the acceptance of equipment after individual testing (Appendix 1 to SNiP 3.01.04-87).
The act formalizes the transfer to the customer of the equipment of the entire facility or for individual installations at large and complex facilities. The act also verifies that the equipment meets the acceptance requirements for its comprehensive testing.
1.4. According to clause 16 of SNiP 3.01.04-87, detached tasks and structures, built-in or attached premises for production or auxiliary purposes, if necessary, to put them into operation during the construction of an object, are taken into operation by working commissions as soon as they are ready, followed by their presentation to the State Acceptance Commission hosting the object as a whole.
1.5. The readiness of the completed electrical work for acceptance is determined by the act of technical readiness of electrical work (Form 2), which is the basis for organizing the work of the working commission for the acceptance of equipment after individual tests. The act of technical readiness can be used to formalize the delivery and acceptance of electrical work, when the working commission has not yet been formed.
1.6. Completed forms of acceptance documentation as part of all documentation listed in Form 1, after issuing an act of technical readiness for electrical work (Form 2), are transferred to the general contractor for subsequent presentation to the working commission for the acceptance of equipment after individual tests; upon completion of the work of the commission and drawing up the corresponding act, the completed documentation, together with the electrical equipment, is transferred to the customer.
Documentation on commissioning works is presented to the commissions for the acceptance of equipment after individual tests and when drawing up an Act of technical readiness for electrical work. The documentation is kept by the customer or the commissioning organization.
1.7. The composition of the electrical equipment of electrical installations, drawn up by acts of technical readiness for electrical work, depends on specific conditions and can be determined, for example:
The boundaries of the technological unit;
The boundaries of the design brand or the main set of working drawings of working documentation (electrical substations - EP, electric lighting - EO, power electrical equipment - EM, etc.);
The boundaries of the shop, built-in, attached and detached premises and structures (power supply of temperature and humidity systems - TVR, electrical equipment of the premises of electric welding stations, compressor stations, etc.);
Electrical rooms, as well as electrical equipment that is part of technological systems (if its installation is carried out by an electrical installation organization).
In order to reduce the spelling, the complexes listed above are summarized by the term - electrical equipment of an electrical installation.
1.8. Records in the forms of acceptance documents must be clear and clear without blots and erasures. If you need to make changes, you should cross out the unnecessary and make the correct entry next to it.
1.9. When filling out the protocols and acts in the column "Result" or similar, the following should be indicated:
"Norm" - if, when assessing the general condition of the elements of an electrical installation by external inspection, the quality of the installation, the operation of mechanical interlocks, the simultaneous closing and opening of contacts, etc. no deviations;
"Produced" - in the case of performing test inclusions, adjustments, test inserts of the withdrawable elements of the equipment;
"Good" ("good") - when filling out the "conclusion" column, if the parameters of the apparatus or line during inspections and checks correspond to the technical specifications.
2. GENERAL FORMS OF ACCEPTANCE DOCUMENTATION
2.1. General forms of acceptance documentation reflect the main stages of electrical installation work, which are determined by SNiP 3.05.06-85, SNiP 3.01.01-85 and SNiP 3.01.04-87; common forms of documents include:
a) a list of technical documentation presented during the delivery and acceptance of electrical work (form 1);
b) an act of technical readiness for electrical work (form 2);
c) a list of changes and deviations from the project (form 3);
d) a list of electrical imperfections that do not interfere with complex testing (form 4);
e) certificate of acceptance and transfer of equipment for installation (form M-25);
f) act on detected equipment defects (form M-27);
g) list of installed electrical equipment (form 5);
h) the act of readiness of the building part of the premises (structures) for the production of electrical work (form 6).
2.2. A certificate of elimination of deficiencies is not included in the technical documentation and is handed over to the customer separately.
2.3. Technical documentation for the delivery and acceptance of electrical work, completed in accordance with Form 1, together with an act of technical readiness for electrical work (Form 2), is transferred to the general contractor; it is an annex to the certificate of acceptance of equipment after individual tests.
2.4. An act of technical readiness for electrical work (Form 2) formalizes the readiness of electrical work for presentation to the working commission for the acceptance of equipment after individual tests.
2.5. The technical readiness certificate (Form 2) is used to draw up (if necessary) the delivery and acceptance of the electrical installation to the general contractor to ensure the safety of completed electrical work, as well as for the delivery and acceptance to the customer (general contractor) of the components of the electrical installation (electrical lighting, cable lines, power lines, etc.) .p.) in temporary operation.
2.6. The certificate of acceptance and transfer of equipment for installation is drawn up according to the standard interdepartmental form M-25, approved by order of the Central Statistical Administration of the USSR No. 628 dated November 27, 1985. Columns and lines of the form, circled in bold lines, include data for automated processing (not used for manual processing).
The same order of the Central Statistical Administration of the USSR introduced form M-27 of the Act on the identified equipment defects. An act is drawn up in cases where equipment defects are identified during installation, commissioning and testing. The need for revision and drying of electrical equipment is formalized by this act.
Acts on forms M-25 and M-27 are prepared by the customer with the participation of installers.
2.7. The list of installed electrical equipment (form 5) is used as an appendix to the Act of technical readiness for electrical work (form 2).
2.8. An act in form 6 formalizes the readiness of the construction part of the facility (premises, structures) for the production of electrical work.
An act in form 6 is prepared by representatives of the construction organization with the participation of installers, who determine the readiness of the construction part of the facility (premises, structures) for the performance of electrical work.
2.9. It is recommended to design the cover for the technical documentation for the delivery and acceptance of electrical work in accordance with the appendix to this VCH.
Mandatory
Appendix 2
STATEMENT
TECHNICAL DOCUMENTATION SUBMITTED DURING DELIVERY AND ACCEPTANCE OF ELECTRICAL INSTALLATION WORKS
Composition of the documentation | Document number | Number of sheets | Note |
|
A set of working drawings for the electrical part - as-built documentation | ||||
A set of factory documentation (certificates of electrical equipment, factory test reports, instructions for installation, commissioning and operation, etc.) | ||||
Acts, protocols, statements, magazines for electrical work and construction work related to the installation of electrical devices | ||||
(signature) |
(Ministry) (city) ______ _________________________________ (trust) (customer) ____________________________________ _________________________________
(plot) ACT OF TECHNICAL READY Commission consisting of:
representative of the general contractor ________________________________________ (position, surname, name, patronymic) (position, surname, name, patronymic) inspected the installed electrical equipment. 1. The electrical installation company performed the following work: _____________ (list, main technical characteristics, physical volumes) _______________ 2. Electrical work was carried out in accordance with the project developed by ___________________________________________________________________________ (project organization) 3. Deviations from the project are listed in Appendix 1 (Form 3). 4. The Commission checked the technical documentation (Appendix 2, Form 1) presented to the extent of the requirements of PUE-85, SNiP 3.05.06-85. 5. Individual tests of electrical equipment ___________________________ ___________________________________________________________________________ (carried out, ___________________________________________________________________________ not carried out) 6. Remaining deficiencies that do not impede integrated testing, and the time frame for their elimination are listed in Appendix 3 (Form 4). 7. The list of installed electrical equipment is given in Appendix 4 (Form 5). 8. Conclusion. 8.1. Electrical work was carried out in accordance with the design documentation in accordance with the requirements of SNiP 3.05.06-85 and PUE-85. 8.2. This Act is the basis for *: a) organization of the work of the working committee on the acceptance of equipment after individual tests; b) direct transfer of the electrical installation to the customer (general contractor) for operation. Customer representative _________________ (signature) General contractor representative _________________ (signature) _________________ (signature) Passed ** Accepted: ___________________________________ _____________________________ (signature) (signature) * Underline whatever applicable. ** To be completed in the case specified in clause 8.2, b of this Act |
Mandatory
Annex 1
to the Act of technical readiness from
"___" __________________ 200 __
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) STATEMENT OF CHANGES AND DEPARTURES FROM THE PROJECT Work Producer ________________________ () (signature) |
Mandatory
Appendix 3
to the Act of technical readiness from
"___" __________________ 200 __
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) SHEET OF WIRING FAILURES THAT DO NOT IMPACT COMPREHENSIVE TESTING assembly general contractor of the customer organization organization
|
Submitted by __________________________________________________
(name of company)
the equipment listed below and technical documentation for it
for installation in _______________________________________________
___________________________________________________________
(place of installation)
(name of the building, structure, workshop, electrical installation)
The reverse side of the M-25 form
When accepting the equipment for installation, the following was established: 1. Equipment of the design specification or drawing (if it does not correspond, indicate what) __________________________________________________ ___________________________________________________________________________ 2. Equipment transferred (indicate the composition of the kit and technical documentation, according to which the acceptance was made and what completeness) ___________________________________________________________________________ ___________________________________________________________________________ 3. Defects during external examination of the equipment (if found, list them in detail) ________________________________________ ___________________________________________________________________________ Note: defects discovered during inspection, installation and testing of equipment are subject to special activation. 4. Conclusion on suitability for installation ______________________________________ ___________________________________________________________________________ ___________________________________________________________________________ Passed by a representative customer
Accepted by a representative installation organization ___________________ ___________________ ___________________ (position) (signature) (surname, and., o.) The specified equipment is accepted for storage. Financially responsible person ____________________________________________ (F., I., O., signature) |
ACT No. Typical departmental form M-27, on revealed equipment defects, approved by order of the Central Statistical Office No. 628 "___" __________________ 200 ___ from 27.11.85 OKUD code (location: city, town, etc.) enterprise (customer) ___________________________________ building (structure), workshop ______________________________________ This act is drawn up in the fact that during the audit, installation, testing (underline the stage) of the equipment listed below, manufactured by ______________________________, accepted for installation according to Act No. _____ dated _______ 200__, the following defects were found: (manufacturer's name) The reverse side of the M-27 form To eliminate the identified defects, it is necessary: _________________________________________________________________________________________________________________________ (measures or works to eliminate the identified defects are indicated in detail) _________________________________________________________________________________________________________________________ (performers and deadlines) Customer representative
Contractor representative _________________________ _______________________ _________________________ (position) (signature) (name, surname) Manufacturer's representative _________________________ _______________________ _________________________ (position) (signature) (name, surname) |
Mandatory
Annex 1
to the Act of technical readiness from
"___" __________________ 200 __
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) LIST OF INSTALLED ELECTRICAL EQUIPMENT electrical organization ___________________ () ___________________ () (signature) (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF READINESS OF THE CONSTRUCTION PART OF THE PREMISES (STRUCTURES) FOR THE PRODUCTION OF ELECTRICAL WORKS A commission consisting of a representative of a construction organization ____________________ __________________________________________________________________________
(position, surname, and., about.) representative of the electrical installation organization _________________________________ __________________________________________________________________________ (position, surname, and., about.) inspected the premises (structures) transferred for the production of electrical work. 1. For the production of electrical work, the following are transferred: __________________________________________________________________________ (name of premises, structures) 2. Premises (structures) made according to __________________________________ __________________________________________________________________________ (indicate the project, drawing No.) taking into account the drawings of building buildings _______________________________________ __________________________________________________________________________ (name of the design organization, number of drawings of construction buildings) The premises (structures) are made according to the project, taking into account construction buildings and comply with the requirements of paragraphs. 2.2.E; 2.12 - 2.15; 2.17; 2.18; 2.20 - 2.26; 3.210 SNiP 3.05.06-85. The premises (structures) listed in clause 1 of this Act are suitable for the performance of electrical work from _________________ 200 ___. 3. Deficiencies that prevent the start of electrical work must be eliminated in the following terms: Representative Representative Representative construction customer electrical organization organization _______________________ ____________________ _______________________ (signature) (signature) (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) INFORMATION ABOUT LIQUIDATION OF FAILURES Commission consisting of: representative of the customer ____________________________________________________ __________________________________________________________________________ (position, surname, and., about.) __________________________________________________________________________ (position, surname, and., about.) carried out an inspection and acceptance of the work performed by the electrical installation organization to eliminate the deficiencies listed in the statement from ________________________________________ 200 ___ The following shortcomings have been eliminated ________________________________________ __________________________________________________________________________ Representative Representative of the assembly customer organization _________________________________ _________________________________ (signature) (signature) |
3. FORMS OF DOCUMENTS ON ELECTRICAL EQUIPMENT OF SWITCHING DEVICES AND ELECTRICAL SUBSTATIONS WITH VOLTAGE UP TO 35 kV INCLUSIVE
3.1. The documents on electrical equipment of switchgears and electrical substations with voltage up to 35 kV inclusively include:
a) acceptance certificate for the installation of a power transformer (form 7);
b) protocol of inspection and testing of the installed electrical equipment of switchgear and electrical substations with voltage up to 35 kV inclusive (form 8);
c) other acceptance documents are drawn up according to the general forms given in section 2 of the Instructions.
3.2. An act according to Form 7 is drawn up for the acceptance-transfer to the installation of power transformers with a capacity of more than 2500 kV × A. Transformers with a capacity of up to 2500 kV × A inclusive are accepted for installation according to the general Act of acceptance and transfer of equipment for installation (form M-25).
If it is necessary to perform electrical measurements on the transformer (provided for by the documentation of the manufacturers and in other cases), they are provided by the customer, involving the commissioning organization for this; in this case, the representative of the commissioning organization is included in the commission and signs the Act.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) POWER TRANSFORMER ACCEPTANCE AND INSTALLATION ACT * Power ___________________________ kV × A, HV ________________________ kV, MV _________________________ kV, LV __________________________ kV. Manufacturer __________________________, type __________________________, serial number _________________________, date of issue _____________________, date of arrival at the site _________________________________________________. Commission consisting of: from the customer's enterprise _________________________________________________ (position, surname, and., about.) from the electrical installation organization _________________________________________ (position, surname, and., about.) checked the condition of the transformer and the conditions necessary for its acceptance for installation, and established: 1. Completeness: a) a set of technical documentation from the manufacturer (factory organization) for the transformer according to the list of GOST 11677-85 (clause 5.15) __________________________________________________________________________ (yes, no) There are no documents __________________________________________________ (name of documents) b) transformer ________________________________________________________ (completed, not fully completed __________________________________________________________________________ units, devices and parts according to the requirements of technical __________________________________________________________________________ documentation - dismantling list of the manufacturer) * Designed for transformers with a capacity of more than 2500 kV × A. Not supplied to the transformer: __________________________________________ 2. Condition of the transformer and its components: a) the results of external inspection of the transformer and its components (no dents and other damage on the transformer tank, bushings, conservator, radiators, cooling system equipment, etc.) _______________________________________ __________________________________________________________________________ b) the results of checking the tightness of the transformer during external examination: safety of seals on all oil taps and sealed plugs __________________________________________________________________________ no oil leakage from the transformer tank and units, __________________________________________________________________________ filled with oil) the presence of excessive gas pressure (for transformers supplied from the manufacturer without oil) _____________________________________________________ __________________________________________________________________________ 3. Provision of conditions for the installation of the transformer: a) the construction part (foundation for the transformer, installation site, driveways, etc.) is made according to project No. __________________________ __________________________________________________________________________ (accepted, not accepted) Installation organization according to act No. from _______________ 200 __ Not completed construction ________________________________________________ (list unfinished works) __________________________________________________________________________ b) provision of the transformer with oil: according to the passport, oil is used in the transformer ______________________ __________________________________________________________________________ (name of the standard, TU, breakdown voltage) in total, oil is required (taking into account the consumption for technological needs) __________________ t. available in the transformer ___________________ t. missing amount of oil ___________________ t. will be supplied by the customer ______________________________________________ (date) c) the customer fulfills the conditions of GOST 11677-75 and confirms the possibility of installing the transformer without revising the active part and without drying; d) in accordance with clause 3.197 of SNiP 3.5.06-85, the following are attached to this Act: certificate of inspection of the transformer and dismantled units after transportation from the manufacturer, act of transportation of the transformer to the place of installation, act of unloading the transformer. The listed documents are drawn up by the customer. 4. Conclusion on suitability for installation ____________________________________ __________________________________________________________________________ Handed over customer representative _________________________ (signature) Accepted installer representative _________________________ (signature) Transformer accepted for storage financially responsible person _________________________ (surname, i., o., signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PROTOCOL OF INSPECTION AND INSPECTION OF INSTALLED ELECTRICAL EQUIPMENT OF SWITCHING DEVICES AND ELECTRICAL SUBSTATIONS WITH VOLTAGE UP TO 35 kV INCLUSIVE On the installed electrical equipment (listed in the statement attached to the Act), in accordance with the requirements of SNiP 3.05.06-85, PUE-85 and the manufacturer's documentation, the following were produced: 1. Adjustment of the mechanical part of communication devices, their contact pairs, drives and interlocks __________________________________________________ (result) 2. Checking communication devices, drives to them and interlocks for repeated switching on and off _______________________________________ (result) 3. Phasing of primary switching circuits __________________________________ ___________________________________________________________________________ (result) 4. Checking the free movement and reliable fixation of the drawout elements of the switchgear in the working and control position, the operation of the keys and mechanical interlocks. __________________________________________________________________________ (result) 5. Lubrication of working parts and contacts of communication devices __________________________________________________________________________ (done) 6. Checking the level of insulating oil in electrical devices and, if necessary, refilling them __________________________________________________ __________________________________________________________________________ (result) 7. Inspection and verification of contact connections for compliance with the requirements of regulatory and technical documentation _______________________________________ (done) 8. Checking the opening of the doors of the chambers (cells, cabinets), the operation of the locks and the implementation of design inscriptions ________________________________________________________ __________________________________________________________________________ (done) Conclusion ____________________________________________________________ __________________________________________________________________________ Inspection and verification performed _______________________ () (signature) Work Producer _______________________ () (signature) |
4. FORMS OF DOCUMENTS ON BATTERIES
4.1. Battery documents include:
a) protocol of inspection and verification of the battery (form 9),
b) a list of measurements at the control discharge of the storage battery (form 10).
4.2. Form 9 act and form 10 list are documents that satisfy the completeness, correctness and compliance with the battery installation project.
The control discharge of the battery is its individual test.
4.3. Upon delivery of the battery with documentation (Forms 9, 10), general documents are transferred in accordance with Section 2 of the Instructions. Acceptance of the construction part (premises, structures, racks, ventilation, painting) is formalized by a general act of form 6.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PROTOCOL OF INSPECTION AND VERIFICATION OF THE TECHNICAL READINESS OF ELECTRICAL WORKS ON THE BATTERY BATTERY 1. Battery ________________________________________________ (battery type) capacity _______ A × h, voltage ______ V, number of elements ______ pcs., assembled in accordance with the project ______________________________________ (name of the design organization, number __________________________________________________________________________ main sets of working drawings) 2. The capacity of the storage battery, measured during testing (with a control discharge), corresponds to the passport data. The insulation resistance of the battery meets the requirements of PUE-85. The results of the analysis of the quality and density of the electrolyte are positive, the analysis protocols are kept by the customer. The list of measurements during the control discharge of the storage battery is attached to this Act. Conclusion. Installation and molding of the battery was carried out in accordance with the design documentation, in compliance with the requirements of PUE-85, SNiP 3.05.06-85 and the manufacturer's documentation. Inspection and verification performed _______________________ () (signature) Workmaker (master) _______________________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) LIST OF MEASUREMENTS AT CHECK DISCHARGE OF THE BATTERY BATTERY Capacity _______________________ A × h, voltage ________ (battery type) В, number of elements ________________________ pcs. Battery insulation resistance, measured according to the PUE methodology p. 1.8.35-1, ___________ kOhm. Room temperature __________ ° С, electrolyte temperature __________ ° С. Measurement table
The discharge is performed by ___________________________ hourly current. The capacity of the storage battery (by category) is __________ A × h, the number of lagging cells is ______ pieces, the numbers of lagging cells are __________ Measurements carried out by the Workmaster (foreman) _____________________ () _____________________ () (signature) (signature) |
5. FORM OF ELECTRIC WIRING DOCUMENTS
5.1. Wiring documents include:
a) an act of inspection of the sewer from the pipes before closing (form 11);
b) protocol of pressure testing of local and separating seals or steel pipes for wiring in explosive zones of classes B-1 and B-1a (form 12);
c) protocol for measuring insulation resistance (form 13);
d) phasing protocol (form 14).
5.2. Wiring documents are sent together with other site documents.
5.3. Form 13 is uniform for filling in the results of measuring the insulation resistance of electrical wiring and cable lines.
5.4. Phasing protocol (form 14) is filled out for trunk, distribution and lighting bus ducts; cables with voltage up to and above 1000V, supplying switchgear from power sources.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF INSPECTION OF SEWERAGE FROM PIPES BEFORE CLOSING Commission consisting of: __________________________________________________________________________ (position, surname, and., about.) representative of the customer ____________________________________________________ ___________________________________________________________________________ (position, surname, and., about.) inspected _____________________ pipes laid in ___________________ (material) (place of laying) On examination it was found: 1. The pipes were laid according to drawings No. _______________________________ developed by __________________________________________________________
2. When performing work, there are no (or allowed) deviations from the design documentation _____________________________________________________________ (if there is a deviation, the __________________________________________________________________________ approved by whom, drawing No. and date of approval) 3. Pipe connections are made ___________, electrical contact at the joints of metal pipes is provided ________________________________________________ (how) 4. Pipes have normal bending radii and are free of dents or damage to prevent wires and cables from pulling through. Conclusion. The work was carried out in accordance with the design documentation, building codes and regulations. Pipes can be cast in concrete, plastered, backfilled with a pound. Customer representative ______________________________ (signature) Representative of the installation organization ______________________________ (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PRESSURE TEST REPORT FOR LOCAL SEALING SEALS OR STEEL PIPES FOR WIRES IN EXPLOSIVE ZONES OF CLASS B-1 AND B-1a Commission consisting of: representative of the electrical installation organization ______________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the customer ____________________________________________________ __________________________________________________________________________ (position, surname, and., about.) carried out pressure tests for the tightness of separating seals or sections of pipe communications. The test results are summarized in the table. The test pressure is measured with a pressure gauge, serial number _____________, accuracy class ___________________. (no more than four) Conclusion. The tightness of the separating seals meets the standards for ___________ class _______________. Representative Customer Representative electrical installation organization __________________________________ ______________________________ (signature) (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) INSULATION RESISTANCE PROTOCOL Place of laying ________________________________________________________ Insulation resistance measured _________________________________________ (device name, type) serial number _______________________, for voltage _____________________ V. Measurement carried out (signature) Work Producer _____________________________ () (signature) |
Checked by the work supervisor _____________________________ ()
(signature)
6. FORMS OF DOCUMENTS ON CABLE LINES
6.1. The documents on cable lines with a voltage of 1 - 35 kV include:
a) act of acceptance of trenches, canals, tunnels and blocks for installation of cables (form 14a);
b) test report of power cable with voltage higher than 1000 V;
c) protocol of inspection and testing of cable insulation, on the drum before laying (form 15);
d) protocol of heating cables on the drum before laying at low temperatures (form 16);
e) act of inspection of the cable duct in the trench and channels before closing (form 17);
f) cable laying log (form 18);
g) a log for cutting cable joints with a voltage higher than 1000 V (form 19).
6.2. A test report for a power cable with a voltage higher than 1000 V is submitted only in the absence of a factory test report (or a copy thereof). The test is performed by the customer in accordance with the requirement of clause 1.8.37 PUE-85.
6.3. To Form 17, the construction organization (general contractor) submits an appendix - a diagram of the binding of external cable routes on the ground, indicating the horizontal and vertical marks.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACCEPTANCE ACT OF TRANCHES, CHANNELS, TUNNELS AND UNITS FOR CABLE INSTALLATION Commission consisting of: a representative of the electrical installation organization __________________________________________________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the customer ____________________________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the general contractor _____________________________________ __________________________________________________________________________ (position, surname, and., about.) performed an inspection and verification of the completed ____________________________________ __________________________________________________________________________ (name of the general contractor) structures for laying cables. 1. The following objects were presented for acceptance and acceptance: __________________________________________________________________________ (trenches, channels, tunnels, cable duct blocks) 2. The structures were built in accordance with the project developed by __________________________________________________________________________ (name of organization, number of drawings of working documentation) 3. Deviation from the project ________________________________________________ __________________________________________________________________________ (transfer) agreed by _______________________________________________________________ (name of the design organization) 4. Layout of the route of the trench (canals, tunnels) ______________________________ (done, ________________________________________________________________________ not executed) according to the project. 5. The width and depth of the trench meets the requirements of the project and PUE-85, the bed is made of _______ with a layer thickness of ___________ mm, the intersection of roads is made in pipes at a depth of _______________ mm, the connection and painting of pipes (material) __________________ (way of doing) The trench is ready for cable laying. 6. The diameter of the holes of the blocks and the correctness of joining of the blocks have been checked, the covers on the manholes of the wells have been installed. 7. Framing and overlapping of cable ducts are completed ___________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ 8. Drainage is made according to the project. 9. Special Notes _____________________________________________________ __________________________________________________________________________ Conclusion. The objects listed in clause 1 of this Act shall be considered accepted for the installation of cables. Application. Diagram of the binding of external cable routes on the ground, indicating the horizontal and vertical elevations of the routes. Representative of the electrical installation organization ________________________ (signature) Customer representative ________________________ (signature) General contractor representative ________________________ (signature) |
(Sample)
POWER CABLE TEST PROTOCOL WITH VOLTAGE OVER 1000 V
____________________________________ (Ministry) ____________________________________ (trust) ____________________________________ (assembly control) ____________________________________ (plot) | ____________________________________ (town) ____________________________________ (customer) ____________________________________ (an object) |
||
PROTOCOL OF INSPECTION AND INSULATION RESISTANCE CHECK ON THE DRUM BEFORE INSTALLING The insulation resistance is measured with a megohmmeter for a voltage of 2500 V, type ______________________ serial number _________________ |
|||
Inspection and verification produced ____________ () (signature) | Work Producer (master) __________ () (signature) |
||
____________________________________ (Ministry) ____________________________________ (trust) ____________________________________ (assembly control) ____________________________________ (plot) | ____________________________________ (town) ____________________________________ (customer) ____________________________________ (an object) 200 ___ g |
||
|
|||
Warming up made ____________ () (signature) | Work Producer ________ () (signature) |
||
PROTOCOL OF WARMING THE CABLES ON THE DRUM BEFORE INSTALLING AT LOW TEMPERATURES
Drum number | Cable brand, voltage, kV, section, mm 2 | Cable length, m | Heating of cables inside heated rooms | Heating of cables by electric current, A |
|||
room temperature, ° С | warm-up duration, h | temperature of the outer turns of the cable at the outside temperature |
|||||
below -10 ° С |
|||||||
Warming up made ____________ () (signature) | Work Producer ________ () (signature) |
||||||
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF INSPECTION OF CABLE DRAINAGE IN TRANCHES AND CHANNELS BEFORE CLOSING Commission consisting of: representative of the electrical installation organization ______________________________ (position, surname, and., about.) representative of the customer __________________________________________________ (position, surname, and., about.) representative of the general contractor ___________________________________ (position, surname, and., about) inspected the cable duct at ____________________________________ (trench, channel) before closing. As a result of the inspection, it was established: 1. The cable was laid according to the project __________________________________ (Name ________________________________________________________________________ design organization, number of drawings and cable magazines) 2. Deviations from the project are agreed and marked on the drawings No. ______________ and the connection diagram. 3. The assembled cables have no external damage; bending radii of cables meet the requirements of GOST 24183-80 *, GOST 16441-78, GOST 24334-80, GOST78 * E; the depth of the cables meets the requirements of clause 2.3.84 PUE-85, and the horizontal distance (clear) between the cables corresponds to clause 2.3.86 PUE-85. 4. The cables are equipped with ____________ couplings, (number) the binding of the couplings (for cables in the trench) is made on the strip of the cable lines. 5. The cable lines were backfilled with a layer of ____________________________ __________________________________________________________________________ (bedding material) and the cables are protected from mechanical damage according to the project, as well as __________________________________________________________________________ (specify additional __________________________________________________________________________ cable protection points, if any) At intersections with other utilities and structures, cables are protected __________________________________________________________ __________________________________________________________________________ (indicate what protected) 6. The marking of the couplings and the cable has been made. 7. Other features noted by the commission ______________________________ __________________________________________________________________________ Conclusion. Trenches (canals) with installed cable lines are accepted for closing. organization _______________________ (signature) Customer representative _______________________ (signature) General contractor representative organization _______________________ (signature) |
____________________________________ (Ministry) ____________________________________ (trust) ____________________________________ (assembly control) ____________________________________ (plot) | ____________________________________ (town) ____________________________________ (customer) ____________________________________ (an object) 200 ___ g |
|
CABLE LOG Work Producer ______________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) INSTALLATION LOG FOR CABLE COUPLINGS VOLTAGE OVER 1000 V Workmaker (master) ____________________ () (signature) |
7. FORMS OF DOCUMENTS ON AIR POWER LINES WITH VOLTAGE UP TO 35 kV INCLUSIVE
7.1. The documents on overhead power lines with voltage up to 35 kV include:
a) the act of readiness of prefabricated reinforced concrete foundations for the support of overhead lines (form 20);
b) the act of readiness of prefabricated reinforced concrete foundations for supports (form 21);
c) a list of installation of an overhead power transmission line (form 22);
d) an act of measurements in kind of dimensions from the wires of the overhead line to the intersected object (form 23).
7.2. Acts in form 20 and 21 are drawn up in organizations that perform work on the construction of foundations.
7.3. An act in form 23, if it is impossible for a representative of the intersection object to participate in the measurements, can be drawn up by representatives of the customer and the electrical installation organization.
7.4. When the overhead line is handed over as an independent electrical installation, together with the documentation (forms 20 - 23), general documents are also drawn up in accordance with section 2 of the Instructions.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) READY ACT OF MONOLITHIC CONCRETE FOUNDATION FOR SUPPORT OF OVL ___________________ Support No. _____________________, support name ______________________ type of ____________________________________________________________________ Commission consisting of: representative of the customer __________________________________________________ (position, __________________________________________________________________________ surname, and., o.) representative of the construction organization ___________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the installer _____________________________________ __________________________________________________________________________ (position, surname, and., about.) reviewed the technical documentation for the foundation, checked the work performed and drew up an act on the following: 1. The foundation is made according to the project according to the drawings ___________, in compliance with the requirements of the PPR and the corresponding section of SNiP 3.05.06-85. 2. According to the submitted protocols, the concrete grade is _______________ Kg / cm 2. Waterproofing of reinforced concrete with a coating is made on the foundation __________________________________________________________________________ (coating material, number of layers) 3. Anchor bolts (embedded parts) are installed according to drawings No. ________; horizontal deviations between the axes of the anchor bolts, as well as the difference between their upper marks, verified by templates, do not exceed the permissible values according to the drawings and SNiP 3.05.06-85. 4. Backfilling and embankment of the foundation have been carried out. 5. Deviation from the project ________________________________________________ (retreat creature) __________________________________________________________________________ agreed with the customer represented by _____________________________________________ (position, surname, and., about.) and the design organization represented by _____________________________________________ (position, surname, and., about.) The agreed deviations from the project are marked on the executed drawings ___________________________________________________________________________ (drawing numbers) 6.Conclusion. The foundation is suitable for installing an overhead line support. Application. Technical documentation for the foundation: executive drawings of the foundation, concrete test report, certificates for hardware. Customer representative ________________________ (signature) Construction representative organization ________________________ (signature) Assembly representative organization ________________________ (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF PREPARED REINFORCED CONCRETE FOUNDATIONS FOR THE INSTALLATION OF SUPPLIES OF OTL ________ Commission consisting of: representative of the customer ____________________________________________________ (position, surname, and., about.) representative of the construction organization _____________________________________ (position, surname, and., about.) representative of the installer _______________________________________ (position, surname, and., about.) reviewed the technical documentation for prefabricated reinforced concrete foundations of overhead lines _________________________________________________________________________ checked the performance of the work and drew up an act on the following: 1. Submitted for the installation of overhead line supports completed with a device ______________ (number) prefabricated reinforced concrete foundations. Of these, under the supports: intermediate ________ (number) anchor _____________, angular _____________, other _____________ foundations. (number) (number) (number) 2. The foundations listed below are made in accordance with the project _________________________________________________________________________ (name of the design organization) according to drawings ______________________________________________________________ (name and number of drawings) in compliance with the requirements of PPR and SNiP 3.05.06-85. 3. The deviation of the dimensions horizontally between the axes of the foundations, as well as the difference between their upper marks, checked by templates, do not exceed the permissible values according to the drawings. 4. Deviation from the project ________________________________________________ _________________________________________________________________________ (retreat creature) agreed with the customer represented by ____________________________________________ (position, surname, and., about.) and the design organization represented by _____________________________________________ (position, surname, and., about.) 5. Assembled reinforced concrete foundations for supports _________________________ _________________________________________________________________________ (support numbers) were not accepted by the commission due to ___________________________________________ _________________________________________________________________________ (indicate the reason) and are excluded from the list of this Act. The term for alteration (revision) of rejected foundations and their re-submission "___" __________ 200__ 6. List of prefabricated reinforced concrete foundations allowed for the installation of supports 7. Conclusion of the commission: prefabricated reinforced concrete foundations according to list 6 are suitable for installing overhead line supports Application: as-built drawings for the foundation, certificates for concrete and hardware. Customer representative ________________________ (signature) Construction representative organization ________________________ (signature) Assembly representative organization ________________________ (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) AIR POWER LINE INSTALLATION LIST 1. Installation of overhead power line supports The deviation of the upper part of the installed supports from the vertical axis, as well as the turn and tilt of the traverses, do not go beyond the limits permissible by the requirements of paragraphs. 3.144 - 3.146 and tables 6, 7 and 8 of SNiP 3.05.06-85. 2. installation of wires and cables. On the overhead line _______ kV, a wire of the brand _______ is mounted, with a cross section of _______ mm 2, in total _______ m, a lightning protection cable of the brand _________________________ length ______________ m. Installation of wires and cables is carried out in accordance with the BJI project. The sag arrows of the wires and cables correspond to the installation curves (tables) of the project. The intersection of overhead lines with other networks and engineering structures was carried out according to the project and formalized by private acts attached to this. 3. Connection of wires and cables. Installation of connections of wires and cables was carried out according to the project in compliance with the requirements of paragraphs. 3.149 - 3.152 SNiP 3.05.06-85 and p. 1.8.38 PUE-85. Before installation on the overhead line, the installation organization checked and rejected the insulators in accordance with the requirements of clause 1.8.32 PUE-85 and pp. 3.147, 3.148 SNiP 3.5.06-85. 4. Installation of arresters and disconnectors. On overhead lines ________ there are mounted: a) tubular arresters type _____________________________________________ (list support numbers) Installation of arresters, adjustment of their external spark gaps are performed in accordance with the working drawings of the project to the requirements of paragraphs. 3.158 - 3.160 SNiP 3.05.06-85 and p. 1.8.29 PUE-85; b) disconnectors of the type ____________________________________________________ on supports _________________________________________________________________ (support numbers) The disconnectors are installed in accordance with the design and documentation of the manufacturers. The mechanical part of the disconnectors, their contact pairs, as well as the disconnector drives are adjusted and checked in accordance with paragraphs. 3.178 - 3.184 SNiP 3.05.06-85 and tested before installation on supports in accordance with clause 8.21 (1, 2, 5, 6) PUE-85. 5. Installation of grounding devices. Installation of grounding devices for overhead lines _______ was carried out in accordance with the project and the requirements of the PUE-85 section "Overvoltage protection, grounding". The resistance of the grounding devices of the supports corresponds to clause 2.5.76 and table 2.5.22 PUE-85. The protocols and measurements of the resistance of grounding devices presented to the commission are kept by the customer (in the commissioning organization). Conclusion: ____________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ Work Producer _____________________________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF MEASUREMENTS IN NATURE DIMENSIONS FROM OTL WIRES TO THE CROSSED OBJECT We, the undersigned, have inspected and measured the intersection of the overhead line _______________________ kV _________________________________________________ (name of overhead line) with object __________________________________________________ and set: (Object name) 1. The intersection is made according to the drawing __________________________________ 2. On the crossing overhead line _______________________________________ (number) wires brand ________________________________. 3. The overhead line supports # ______________, which limit the intersection of the object, are installed at the pickets. 4. The horizontal distance from the axis of the crossed object to the axes of the overhead line transition supports is _________________ m. 5. Distance from the nearest overhead line wire ____________________________________ (before crossing Is ______ m. object, wire, rail head, etc.) 6. Measurements were carried out at an ambient temperature of _____________ ° C. Crossing object representative _________________________________________ ___________________________________________________________________________ (name of organization, position, surname, and., o.) Customer representative _______________________ (signature) Assembly representative organization _______________________ (signature) |
8. FORMS OF DOCUMENTS ON EARTHING DEVICES
8.1. The documents on grounding devices include an act of survey of hidden works on the installation of grounding devices and connection to natural grounding devices (form 24).
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF INSPECTION OF HIDDEN WORKS ON INSTALLATION OF EARTHING DEVICES Commission consisting of: representative of the installer ________________________________________ ___________________________________________________________________________ (position, surname, and., about.) ___________________________________________________________________________ (position, surname, and., about.) made an inspection of the work performed on the installation of grounding devices. Inspection established: 1. The grounding device is made in accordance with the project _____________, (title) developed by _____________________________________________________________ (project organization) according to drawings _______________________________________________________________ (room) 2. Deviation from the project _________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ agreed with ______________________________________________________________ (organization, position, surname, and., about., date) __________________________________________________________________________ and included in the drawings ________________________________________________________ (room) 3. Characteristics of the grounding device. 4. The nature of the connections between the elements of the grounding device and their connection to natural grounding devices ___________________________________________________________________________ ___________________________________________________________________________ 5. Defects are highlighted _____________________________________________________ ___________________________________________________________________________ 6. Conclusion. The grounding device can be covered with earth. Representative of the electrical organization _______________________ (signature) Customer representative _______________________ (signature) |
(Sample cover for the set
technical documentation for the delivery
acceptance of electrical work)
DEPARTMENTAL BUILDING STANDARDS
INSTRUCTIONS FOR REGISTRATION
ELECTRICAL WORKS
VSN 123-90
MMSS USSR
MOSCOW 2001
MINISTRY OF INSTALLATION AND SPECIAL
CONSTRUCTION WORKS OF THE USSR
DEPARTMENTAL BUILDING STANDARDS
INSTRUCTIONS FOR REGISTRATION
ACCEPTANCE DOCUMENTATION
ELECTRICAL WORKS
VSN 123-90
MMSS USSR
MOSCOW 2001
Instructions for the preparation of acceptance documents for electrical work covers the types of work that are subject to the requirements of SNiP 3.05.06-85 "Electrical devices", in terms of electrical installations and electrical networks with voltages up to 35 kV inclusive, carried out by organizations of the USSR Ministry of Montazhspetsstroy.
The instruction complies with the requirements of SNiP 3.01.01-85, SNiP 3.01.04-87, SNiP 3.05.06-85 and PES-85 (6th edition).
Instructions for drawing up acceptance documents for electrical installation work were developed by the All-Union State Research and Design Institute VNIIProektelektromontazh of the Ministry of Installation and Construction Works of the USSR.
With the entry into force of this Instruction, the “Instruction for the preparation of acceptance documents for electrical work” is canceled.
1. GENERAL PROVISIONS
1.1. Uniform forms of acceptance documentation for electrical installation work are being established.
1.2. Unified forms of acceptance documentation cover all types of electrical installation work, which are subject to the requirements of SNiP 3.05.06-85 "Electrical devices", and the restrictions introduced by the order of the Minmontazhspetsstroy No. 200 dated 06/19/85 - on the procedure for performing certain types of installation and special construction works in accordance with the profile of the organizations of the Ministry.
The instruction does not apply to the preparation of acceptance documents:
For electrical work in electrical installations and electrical networks with voltages above 35 kV1;
For revision, drying and repair of electrical equipment1;
For the installation of electrical machines1;
For the installation of contact networks for industrial and urban electrified transport 2.
1 The installation organizations of the USSR Ministry of Montazhspetsstroy do not perform the specified work.
2 Acceptance documentation for the installation of contact networks is determined by the requirements of the "Instructions for the installation of contact networks of industrial and urban electrified transport" VSN 13-77 / ММССС USSR.
1.3. Comprehensive acceptance of equipment as a whole, including electrical equipment, is carried out by a working commission appointed by the customer (developer), while an act of the working commission is drawn up on the acceptance of equipment after individual testing (Appendix 1 to SNiP 3.01.04-87).
The act formalizes the transfer to the customer of the equipment of the entire facility or for individual installations at large and complex facilities. The act also verifies that the equipment meets the acceptance requirements for its comprehensive testing.
b) an act of technical readiness for electrical work ();
c) a list of changes and deviations from the project ();
d) a list of electrical imperfections that do not interfere with complex testing ();
e) act of acceptance and transfer of equipment for installation ();
f) act on detected equipment defects ();
g) list of installed electrical equipment ();
h) the act of readiness of the building part of the premises (structures) for the production of electrical work ().
2.2. A certificate of elimination of deficiencies is not included in the technical documentation and is handed over to the customer separately.
2.3. Technical documentation for the delivery and acceptance of electrical work, completed together with the certificate of technical readiness for electrical work (), is transferred to the general contractor; it is an annex to the certificate of acceptance of equipment after individual tests.
2.4. An act of technical readiness for electrical work () formalizes the readiness of electrical work for presentation to the working commission for the acceptance of equipment after individual tests.
2.5. The technical readiness certificate () is used to draw up (if necessary) the delivery and acceptance of the electrical installation to the general contractor to ensure the safety of completed electrical work, as well as for the delivery and acceptance to the customer (general contractor) of the components of the electrical installation (electric lighting, cable lines, power lines, etc. .) for temporary use.
2.6. The certificate of acceptance and transfer of equipment for installation is drawn up according to a standard interdepartmental certificate, approved by order of the Central Statistical Administration of the USSR No. 628 of 27.11.85. Columns and lines of the form, circled in bold lines, include data for automated processing (not used for manual processing).
By the same order of the Central Statistical Administration of the USSR, the Act on the revealed defects of equipment was introduced. An act is drawn up in cases where equipment defects are identified during installation, commissioning and testing. The need for revision and drying of electrical equipment is formalized by this act.
Appendix 2
STATEMENT
TECHNICAL DOCUMENTATION SUBMITTED DURING DELIVERY AND ACCEPTANCE OF ELECTRICAL INSTALLATION WORKS
Composition of the documentation |
Document number |
Number of sheets |
Note |
|
A set of working drawings for the electrical part - as-built documentation |
||||
A set of factory documentation (certificates of electrical equipment, factory test reports, instructions for installation, commissioning and operation, etc.) |
||||
Acts, protocols, statements, magazines for electrical work and construction work related to the installation of electrical devices |
||||
(signature) |
(Ministry) (city) ______ _________________________________ (trust) (customer) ____________________________________ _________________________________
(plot) ACT OF TECHNICAL READY Commission consisting of:
representative of the general contractor ________________________________________ (position, surname, name, patronymic) (position, surname, name, patronymic) inspected the installed electrical equipment. 1. The electrical installation company performed the following work: _____________ _______________ (list, main technical characteristics, physical volumes) 2. Electrical work was carried out in accordance with the project developed by ___________________________________________________________________________ (project organization) 3. Deviations from the project are listed in Appendix 1 (). 4. The Commission checked the technical documentation () presented to the extent of the requirements of PUE-85, SNiP 3.05.06-85. 5. Individual tests of electrical equipment ___________________________ ___________________________________________________________________________ (carried out, ___________________________________________________________________________ not carried out) 6. Remaining deficiencies that do not impede integrated testing, and the time frame for their elimination are listed in Appendix 3 (). 7. The list of installed electrical equipment is given in Appendix 4 (). 8. Conclusion. 8.1. Electrical work was carried out in accordance with the design documentation in accordance with the requirements of SNiP 3.05.06-85 and PUE-85. 8.2. This Act is the basis for *: a) organization of the work of the working committee on the acceptance of equipment after individual tests; Customer representative _________________ (signature) General contractor representative _________________ (signature) _________________ (signature) Passed ** Accepted: ___________________________________ _____________________________ (signature) (signature) * Underline whatever applicable. ** To be completed in the case specified in this Act |
Annex 1
to the Act of technical readiness from
"___" __________________ 200 __
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) STATEMENT OF CHANGES AND DEPARTURES FROM THE PROJECT Work Producer ________________________ () (signature) |
Appendix 3
to the Act of technical readiness from
"___" __________________ 200 __
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) SHEET OF WIRING FAILURES THAT DO NOT IMPACT COMPREHENSIVE TESTING Representative RepresentativeRepresentative assembly general contractorcustomer organization organization
|
on revealed equipment defects, approved by order of the Central Statistical Office No. 628 "___" __________________ 200 ___ from 27.11.85 OKUD code (location: city, town, etc.) enterprise (customer) ___________________________________ building (structure), workshop ______________________________________ This act is drawn up in the fact that during the audit, installation, testing (underline the stage) of the equipment listed below, manufactured by ______________________________, accepted for installation under Act No. _____ dated _______ 200__, the following defects were found: (manufacturer's name) The reverse side of the M-27 form To eliminate the identified defects, it is necessary: (measures or works to eliminate the identified defects are indicated in detail) _________________________________________________________________________________________________________________________ (performers and deadlines) Customer representative
Contractor representative _________________________ _______________________ _________________________ (position) (signature) (name, surname) Manufacturer's representative _________________________ _______________________ _________________________ (position) (signature) (name, surname) |
Annex 1
to the Act of technical readiness from
"___" __________________ 200 __
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) LIST OF INSTALLED ELECTRICAL EQUIPMENT RepresentativeCustomer representative electrical organization ___________________ () ___________________ () (signature) (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF READINESS OF THE CONSTRUCTION PART OF THE PREMISES (STRUCTURES) FOR THE PRODUCTION OF ELECTRICAL WORKS A commission consisting of a representative of a construction organization ____________________ __________________________________________________________________________ (position, surname, and., about.)
representative of the electrical installation organization _________________________________ __________________________________________________________________________ (position, surname, and., about.) inspected the premises (structures) transferred for the production of electrical work. __________________________________________________________________________ (name of premises, structures) 2. Premises (structures) made according to __________________________________ __________________________________________________________________________ (indicate the project, drawing No.) taking into account the drawings of building buildings _______________________________________ __________________________________________________________________________ (name of the design organization, number of drawings of construction buildings) The premises (structures) are made according to the project, taking into account construction buildings and comply with the requirements of paragraphs. 2.2.E; 2.12 - 2.15; 2.17; 2.18; 2.20 - 2.26; 3.210 SNiP 3.05.06-85. The premises (structures) listed in this Act are suitable for the performance of electrical work from _________________ 200 ___. 3. Deficiencies that prevent the start of electrical work must be eliminated in the following terms: Representative RepresentativeRepresentative constructioncustomer electrical organization organization _______________________ ____________________ _______________________ (signature) (signature) (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) INFORMATION ABOUT LIQUIDATION OF FAILURES Commission consisting of: representative of the customer ____________________________________________________ __________________________________________________________________________ (position, surname, and., about.) __________________________________________________________________________ (position, surname, and., about.) carried out an inspection and acceptance of the work performed by the electrical installation organization to eliminate the deficiencies listed in the statement from ________________________________________ 200 ___ The following shortcomings have been eliminated ________________________________________ __________________________________________________________________________ RepresentativeAssembly representative customerorganization _________________________________ _________________________________ (signature) (signature) |
3. FORMS OF DOCUMENTS ON ELECTRICAL EQUIPMENT OF SWITCHING DEVICES AND ELECTRICAL SUBSTATIONS WITH VOLTAGE UP TO 35 kV INCLUSIVE
3.1. The documents on electrical equipment of switchgears and electrical substations with voltage up to 35 kV inclusively include:
a) acceptance certificate for the installation of a power transformer ();
b) protocol of inspection and testing of installed electrical equipment of switchgears and electrical substations with voltage up to 35 kV inclusive ();
c) other acceptance documents are drawn up according to the general forms given in the Instructions.
If it is necessary to perform electrical measurements on the transformer (provided for by the documentation of the manufacturers and in other cases), they are provided by the customer, involving the commissioning organization for this; in this case, the representative of the commissioning organization is included in the commission and signs the Act.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) POWER TRANSFORMER ACCEPTANCE AND INSTALLATION ACT * Power ___________________________ kV × A, HV ________________________ kV, MV _________________________ kV, LV __________________________ kV. Manufacturer __________________________, type __________________________, serial number _________________________, date of issue _____________________, date of arrival at the site _________________________________________________. Commission consisting of: from the customer's enterprise _________________________________________________ (position, surname, and., about.) from the electrical installation organization _________________________________________ (position, surname, and., about.) checked the condition of the transformer and the conditions necessary for its acceptance for installation, and established: 1. Completeness: a) a set of technical documentation from the manufacturer (factory organization) for the transformer according to the list of GOST 11677-85 (clause 5.15) __________________________________________________________________________ (yes, no) There are no documents __________________________________________________ (name of documents) b) transformer ________________________________________________________ (completed, not fully completed __________________________________________________________________________ units, devices and parts according to the requirements of technical __________________________________________________________________________ documentation - dismantling list of the manufacturer) * Designed for transformers with a capacity of more than 2500 kV × A. Not supplied to the transformer: __________________________________________ 2. Condition of the transformer and its components: a) the results of external inspection of the transformer and its components (no dents and other damage on the transformer tank, bushings, expander, radiators, cooling system equipment, etc.) _______________________________________ __________________________________________________________________________ b) the results of checking the tightness of the transformer during external examination: safety of seals on all oil taps and sealed plugs __________________________________________________________________________ no oil leakage from the transformer tank and units, __________________________________________________________________________ filled with oil) the presence of excessive gas pressure (for transformers supplied from the manufacturer without oil) _____________________________________________________ __________________________________________________________________________ 3. Provision of conditions for the installation of the transformer: a) the construction part (foundation for the transformer, installation site, driveways, etc.) is made according to project No. __________________________ __________________________________________________________________________ (accepted, not accepted) Installation organization according to act No. from _______________ 200 __ Not completed construction ________________________________________________ (list unfinished works) __________________________________________________________________________ b) provision of the transformer with oil: according to the passport, oil is used in the transformer ______________________ __________________________________________________________________________ (name of the standard, TU, breakdown voltage) in total, oil is required (taking into account the consumption for technological needs) __________________ t. available in the transformer ___________________ t. missing amount of oil ___________________ t. will be supplied by the customer ______________________________________________ (date) c) the customer fulfills the conditions of GOST 11677-75 and confirms the possibility of installing the transformer without revising the active part and without drying; d) in accordance with clause 3.197 of SNiP 3.5.06-85, the following are attached to this Act: certificate of inspection of the transformer and dismantled units after transportation from the manufacturer, act of transportation of the transformer to the place of installation, act of unloading the transformer. The listed documents are drawn up by the customer. 4. Conclusion on suitability for installation ____________________________________ __________________________________________________________________________ Handed over customer representative _________________________ (signature) Accepted installer representative _________________________ (signature) Transformer accepted for storage financially responsible person _________________________ (surname, i., o., signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PROTOCOL OF INSPECTION AND INSPECTION OF INSTALLED ELECTRICAL EQUIPMENT OF SWITCHING DEVICES AND ELECTRICAL SUBSTATIONS WITH VOLTAGE UP TO 35 kV INCLUSIVE On the assembled electrical equipment (listed in the statement attached to the Act), in accordance with the requirements of SNiP 3.05.06-85, PUE-85 and the manufacturer's documentation, the following were produced: 1. Adjustment of the mechanical part of communication devices, their contact pairs, drives and interlocks __________________________________________________ (result) 2. Checking communication devices, drives to them and interlocks for repeated switching on and off _______________________________________ (result) 3. Phasing of primary switching circuits __________________________________ ___________________________________________________________________________ (result) 4. Checking the free movement and reliable fixation of the drawout elements of the switchgear in the working and control position, the operation of the keys and mechanical interlocks. __________________________________________________________________________ (result) 5. Lubrication of working parts and contacts of communication devices __________________________________________________________________________ (done) 6. Checking the level of insulating oil in electrical devices and, if necessary, refilling them __________________________________________________ __________________________________________________________________________ (result) 7. Inspection and verification of contact connections for compliance with the requirements of regulatory and technical documentation _______________________________________ (done) 8. Checking the opening of the doors of the chambers (cells, cabinets), the operation of the locks and the implementation of design inscriptions ________________________________________________________ __________________________________________________________________________ (done) Conclusion ____________________________________________________________ __________________________________________________________________________ Inspection and verification performed _______________________ () (signature) Work Producer _______________________ () (signature) |
4. FORMS OF DOCUMENTS ON BATTERIES
4.1. Battery documents include:
a) protocol of inspection and testing of the battery (),
b) a list of measurements at the control discharge of the storage battery ().
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PROTOCOL OF INSPECTION AND VERIFICATION OF THE TECHNICAL READINESS OF ELECTRICAL INSTALLATION WORKS ON THE BATTERY BATTERY 1. Battery ________________________________________________ (battery type) capacity _______ A × h, voltage ______ V, number of elements ______ pcs., assembled in accordance with the project ______________________________________ (name of the design organization, number __________________________________________________________________________ main sets of working drawings) 2. The capacity of the storage battery, measured during testing (with a control discharge), corresponds to the passport data. The insulation resistance of the battery meets the requirements of PUE-85. The results of the analysis of the quality and density of the electrolyte are positive, the analysis protocols are kept by the customer. The list of measurements during the control discharge of the storage battery is attached to this Act. Conclusion. Installation and molding of the battery was carried out in accordance with the design documentation, in compliance with the requirements of PUE-85, SNiP 3.05.06-85 and the manufacturer's documentation. Inspection and verification performed _______________________ () (signature) _______________________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) LIST OF MEASUREMENTS AT CHECK DISCHARGE OF THE BATTERY BATTERY Capacity _______________________ A × h, voltage ________ (battery type) В, number of elements ________________________ pcs. Battery insulation resistance, measured according to the PUE methodology p. 1.8.35-1, ___________ kOhm. Room temperature __________ ° С, electrolyte temperature __________ ° С. Measurement table
The discharge is performed by ___________________________ hourly current. The capacity of the storage battery (by category) is __________ A × h, the number of lagging cells is ______ pieces, the numbers of lagging cells are __________ Measurements performedWorkmaker (master) _____________________ () _____________________ () (signature) (signature) |
5. FORM OF ELECTRIC WIRING DOCUMENTS
5.1. Wiring documents include:
a) the act of inspection of the sewer from the pipes before closing ();
b) protocol of pressure testing of local and separating seals or steel pipes for wiring in explosive zones of classes B-1 and B-1a ();
c) protocol for measuring insulation resistance ();
5.2. Wiring documents are sent together with other site documents.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF INSPECTION OF SEWERAGE FROM PIPES BEFORE CLOSING Commission consisting of: representative of the installer _____________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the customer ____________________________________________________ ___________________________________________________________________________ (position, surname, and., about.) inspected _____________________ pipes laid in ___________________ (material) (place of laying) On examination it was found: 1. The pipes were laid according to drawings No. _______________________________ developed by __________________________________________________________
2. When performing work, there are no (or allowed) deviations from the design documentation _____________________________________________________________ (if there is a deviation, the __________________________________________________________________________ approved by whom, drawing No. and date of approval) 3. Pipe connections are made ___________, electrical contact at the joints of metal pipes is provided ________________________________________________ (how) 4. Pipes have normal bending radii and are free of dents or damage to prevent wires and cables from pulling through. Conclusion. The work was carried out in accordance with the design documentation, building codes and regulations. Pipes can be cast in concrete, plastered, backfilled with a pound. Customer representative ______________________________ (signature) Representative of the installation organization ______________________________ (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PRESSURE TEST REPORT FOR LOCAL SEALING SEALS OR STEEL PIPES FOR WIRES IN EXPLOSIVE ZONES OF CLASS B-1 AND B-1a Commission consisting of: representative of the electrical installation organization ______________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the customer ____________________________________________________ __________________________________________________________________________ (position, surname, and., about.) carried out pressure tests for the tightness of separating seals or sections of pipe communications. The test results are summarized. The test pressure is measured with a pressure gauge, serial number _____________, accuracy class ___________________. (no more than four) Conclusion. The tightness of the separating seals meets the standards for ___________ class _______________. RepresentativeCustomer representative electrical installation organization __________________________________ ______________________________ (signature) (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) INSULATION RESISTANCE PROTOCOL Place of laying ________________________________________________________ Insulation resistance measured _________________________________________ (device name, type) serial number _______________________, for voltage _____________________ V. Measurement carried out (signature) Work Producer _____________________________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) PHASING PROTOCOL Checked by the work supervisor _____________________________ () (signature) |
6. FORMS OF DOCUMENTS ON CABLE LINES
6.1. The documents on cable lines with a voltage of 1 - 35 kV include:
a) act of acceptance of trenches, canals, tunnels and blocks for installation of cables ();
b) test report of power cable with voltage higher than 1000 V;
c) protocol of inspection and testing of cable insulation, on the drum before laying ();
d) protocol of heating cables on the drum before laying at low temperatures ();
e) certificate of inspection of the cable duct in the trench and channels before closing ();
f) cable laying log ();
g) a log for cutting cable glands with a voltage higher than 1000 V ().
6.2. A test report for a power cable with a voltage higher than 1000 V is submitted only in the absence of a factory test report (or a copy thereof). The test is performed by the customer in accordance with the requirement of clause 1.8.37 PUE-85.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACCEPTANCE ACT OF TRANCHES, CHANNELS, TUNNELS AND UNITS FOR CABLE INSTALLATION Commission consisting of: a representative of the electrical installation organization __________________________________________________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the customer ____________________________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the general contractor _____________________________________ __________________________________________________________________________ (position, surname, and., about.) performed an inspection and verification of the completed ____________________________________ __________________________________________________________________________ (name of the general contractor) structures for laying cables. __________________________________________________________________________ (trenches, channels, tunnels, cable duct blocks) 2. The structures were built in accordance with the project developed by __________________________________________________________________________ (name of organization, number of drawings of working documentation) 3. Deviation from the project ________________________________________________ __________________________________________________________________________ (transfer) agreed by _______________________________________________________________ (name of the design organization) 4. Layout of the route of the trench (canals, tunnels) ______________________________ (done, ________________________________________________________________________ not executed) according to the project. 5. The width and depth of the trench meets the requirements of the project and PUE-85, the bed is made of _______ with a layer thickness of ___________ mm, the intersection of roads is made in pipes at a depth of _______________ mm, the connection and painting of pipes (material) __________________ (way of doing) The trench is ready for cable laying. 6. The diameter of the holes of the blocks and the correctness of joining of the blocks have been checked, the covers on the manholes of the wells have been installed. 7. Framing and overlapping of cable ducts are completed ___________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ 8. Drainage is made according to the project. 9. Special Notes _____________________________________________________ __________________________________________________________________________ Conclusion. The objects listed in this Act are considered accepted for the installation of cables. Application. Diagram of the binding of external cable routes on the ground, indicating the horizontal and vertical elevations of the routes. Representative of the electrical installation organization ________________________ (signature) Customer representative ________________________ (signature) General contractor representative ________________________ (signature) |
(Sample)
POWER CABLE TEST PROTOCOL WITH VOLTAGE OVER 1000 V
____________________________________ (Ministry) ____________________________________ (trust) ____________________________________ (assembly control) ____________________________________ (plot) |
____________________________________ (town) ____________________________________ (customer) ____________________________________ (an object) |
||
PROTOCOL OF INSPECTION AND INSULATION RESISTANCE CHECK ON THE DRUM BEFORE INSTALLING The insulation resistance is measured with a megohmmeter for a voltage of 2500 V, type ______________________ serial number _________________ |
|||
Inspection and verification produced ____________ () (signature) |
Work Producer (master) __________ () (signature) |
||
____________________________________ (Ministry) ____________________________________ (trust) ____________________________________ (assembly control) ____________________________________ (plot) |
____________________________________ (town) ____________________________________ (customer) ____________________________________ (an object) 200 ___ g |
||
PROTOCOL OF WARMING THE CABLES ON THE DRUM BEFORE INSTALLING AT LOW TEMPERATURES |
|||
Warming up made ____________ () (signature) |
Work Producer ________ () (signature) |
||
PROTOCOL OF WARMING THE CABLES ON THE DRUM BEFORE INSTALLING AT LOW TEMPERATURES
Drum number |
Cable brand, voltage, kV, section, mm2 |
Cable length, m |
Heating of cables inside heated rooms |
Heating of cables by electric current, A |
|||
room temperature, ° С |
warm-up duration, h |
temperature of the outer turns of the cable at the outside temperature |
|||||
below -10 ° С |
|||||||
Warming up made ____________ () (signature) |
Work Producer ________ () (signature) |
||||||
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF INSPECTION OF CABLE DRAINAGE IN TRANCHES AND CHANNELS BEFORE CLOSING Commission consisting of: representative of the electrical installation organization ______________________________ (position, surname, and., about.) representative of the customer __________________________________________________ (position, surname, and., about.) representative of the general contractor ___________________________________ (position, surname, and., about) inspected the cable duct at ____________________________________ (trench, channel) before closing. As a result of the inspection, it was established: 1. The cable was laid according to the project __________________________________ (Name ________________________________________________________________________ design organization, number of drawings and cable magazines) 2. Deviations from the project are agreed and marked on the drawings No. ______________ and the connection diagram. 3. The assembled cables have no external damage; bending radii of cables meet the requirements of GOST 24183-80 *, GOST 16441-78, GOST 24334-80, GOST78 * E; the depth of the cables meets the requirements of clause 2.3.84 PUE-85, and the horizontal distance (clear) between the cables corresponds to clause 2.3.86 PUE-85. 4. The cables are equipped with ____________ couplings, (number) the binding of the couplings (for cables in the trench) is made on the strip of the cable lines. 5. The cable lines were backfilled with a layer of ____________________________ __________________________________________________________________________ (bedding material) and the cables are protected from mechanical damage according to the project, as well as __________________________________________________________________________ (specify additional __________________________________________________________________________ cable protection points, if any) At intersections with other utilities and structures, cables are protected __________________________________________________________ __________________________________________________________________________ (indicate what protected) 6. The marking of the couplings and the cable has been made. 7. Other features noted by the commission ______________________________ __________________________________________________________________________ Conclusion. Trenches (canals) with installed cable lines are accepted for closing. organization _______________________ (signature) Customer representative _______________________ (signature) General contractor representative organization _______________________ (signature) |
____________________________________ (Ministry) ____________________________________ (trust) ____________________________________ (assembly control) ____________________________________ (plot) |
____________________________________ (town) ____________________________________ (customer) ____________________________________ (an object) 200 ___ g |
|
CABLE LOG Work Producer ______________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) INSTALLATION LOG FOR CABLE COUPLINGS VOLTAGE OVER 1000 V Workmaker (master) ____________________ () (signature) |
7. FORMS OF DOCUMENTS ON AIR POWER LINES WITH VOLTAGE UP TO 35 kV INCLUSIVE
7.1. The documents on overhead power lines with voltage up to 35 kV include:
a) the act of readiness of prefabricated reinforced concrete foundations for the support of overhead lines (form 20 of the Instruction.
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) READY ACT OF MONOLITHIC CONCRETE FOUNDATION FOR SUPPORT OF OVL ___________________ Support No. _____________________, support name ______________________ type of ____________________________________________________________________ Commission consisting of: representative of the customer __________________________________________________ (position, __________________________________________________________________________ surname, and., o.) representative of the construction organization ___________________________________ __________________________________________________________________________ (position, surname, and., about.) representative of the installer _____________________________________ __________________________________________________________________________ (position, surname, and., about.) reviewed the technical documentation for the foundation, checked the work performed and drew up an act on the following: 1. The foundation is made according to the project according to the drawings ___________, in compliance with the requirements of the PPR and the corresponding section of SNiP 3.05.06-85. 2. According to the submitted protocols, the concrete grade is _______________ Kg / cm2. Waterproofing of reinforced concrete with a coating is made on the foundation __________________________________________________________________________ (coating material, number of layers) 3. Anchor bolts (embedded parts) are installed according to drawings No. ________; horizontal deviations between the axes of the anchor bolts, as well as the difference between their upper marks, verified by templates, do not exceed the permissible values according to the drawings and SNiP 3.05.06-85. 4. Backfilling and embankment of the foundation have been carried out. 5. Deviation from the project ________________________________________________ (retreat creature) __________________________________________________________________________ agreed with the customer represented by _____________________________________________ (position, surname, and., about.) and the design organization represented by _____________________________________________ (position, surname, and., about.) The agreed deviations from the project are marked on the executed drawings ___________________________________________________________________________ (drawing numbers) 6.Conclusion. The foundation is suitable for installing an overhead line support. Application. Technical documentation for the foundation: executive drawings of the foundation, concrete test report, certificates for hardware. Customer representative ________________________ (signature) Construction representative organization ________________________ (signature) Assembly representative organization ________________________ (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF PREPARED REINFORCED CONCRETE FOUNDATIONS FOR THE INSTALLATION OF SUPPLIES OF OTL ________ Commission consisting of: representative of the customer ____________________________________________________ (position, surname, and., about.) representative of the construction organization _____________________________________ (position, surname, and., about.) representative of the installer _______________________________________ (position, surname, and., about.) reviewed the technical documentation for prefabricated reinforced concrete foundations of overhead lines _________________________________________________________________________ checked the performance of the work and drew up an act on the following: 1. Submitted for the installation of overhead line supports completed with a device ______________ (number) prefabricated reinforced concrete foundations. Of these, under the supports: intermediate ________ (number) anchor _____________, angular _____________, other _____________ foundations. (number) (number) (number) 2. The foundations listed below are made in accordance with the project _________________________________________________________________________ (name of the design organization) according to drawings ______________________________________________________________ (name and number of drawings) in compliance with the requirements of PPR and SNiP 3.05.06-85. 3. The deviation of the dimensions horizontally between the axes of the foundations, as well as the difference between their upper marks, checked by templates, do not exceed the permissible values according to the drawings. 4. Deviation from the project ________________________________________________ _________________________________________________________________________ (retreat creature) agreed with the customer represented by ____________________________________________ (position, surname, and., about.) and the design organization represented by _____________________________________________ (position, surname, and., about.) 5. Assembled reinforced concrete foundations for supports _________________________ _________________________________________________________________________ (support numbers) were not accepted by the commission due to ___________________________________________ _________________________________________________________________________ (indicate the reason) and are excluded from the list of this Act. The term for alteration (revision) of rejected foundations and their re-submission "___" __________ 200__ 7. Conclusion of the commission: prefabricated reinforced concrete foundations are suitable for the installation of overhead line supports Application: as-built drawings for the foundation, certificates for concrete and hardware. Customer representative ________________________ (signature) Construction representative organization ________________________ (signature) Assembly representative organization ________________________ (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) AIR POWER LINE INSTALLATION LIST 1. Installation of overhead power line supports
The deviation of the upper part of the installed supports from the vertical axis, as well as the turn and tilt of the traverses, do not go beyond the limits permissible by the requirements of paragraphs. 3.144 - 3.146 and tables 6, 7 and 8 of SNiP 3.05.06-85. 2. installation of wires and cables. On the overhead line _______ kV, a wire of the brand _______ is mounted, with a cross section of _______ mm2, in total _______ m, a lightning protection cable of the brand _________________________ length ______________ m. Installation of wires and cables is carried out in accordance with the BJI project. The sag arrows of the wires and cables correspond to the installation curves (tables) of the project. The intersection of overhead lines with other networks and engineering structures was carried out according to the project and formalized by private acts attached to this. 3. Connection of wires and cables. Installation of connections of wires and cables was carried out according to the project in compliance with the requirements of paragraphs. 3.149 - 3.152 SNiP 3.05.06-85 and p. 1.8.38 PUE-85. Before installation on the overhead line, the installation organization checked and rejected the insulators in accordance with the requirements of clause 1.8.32 PUE-85 and pp. 3.147, 3.148 SNiP 3.5.06-85. 4. Installation of arresters and disconnectors. On overhead lines ________ there are mounted: a) tubular arresters type _____________________________________________ (list support numbers) Installation of arresters, adjustment of their external spark gaps are performed in accordance with the working drawings of the project to the requirements of paragraphs. 3.158 - 3.160 SNiP 3.05.06-85 and p. 1.8.29 PUE-85; b) disconnectors of the type ____________________________________________________ on supports _________________________________________________________________ (support numbers) The disconnectors are installed in accordance with the design and documentation of the manufacturers. The mechanical part of the disconnectors, their contact pairs, as well as the disconnector drives are adjusted and checked in accordance with paragraphs. 3.178 - 3.184 SNiP 3.05.06-85 and tested before installation on supports in accordance with clause 8.21 (1, 2, 5, 6) PUE-85. 5. Installation of grounding devices. Installation of grounding devices for overhead lines _______ was carried out in accordance with the project and the requirements of the PUE-85 section "Overvoltage protection, grounding". The resistance of the grounding devices of the supports corresponds to clause 2.5.76 and table 2.5.22 PUE-85. The protocols and measurements of the resistance of grounding devices presented to the commission are kept by the customer (in the commissioning organization). Conclusion: ____________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ Work Producer _____________________________ () (signature) |
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF MEASUREMENTS IN NATURE DIMENSIONS FROM OTL WIRES TO THE CROSSED OBJECT We, the undersigned, have inspected and measured the intersection of the overhead line _______________________ kV _________________________________________________ (name of overhead line) with object __________________________________________________ and set: (Object name) 1. The intersection is made according to the drawing __________________________________ 2. On the crossing overhead line _______________________________________ (number) wires brand ________________________________. 3. The overhead line supports # ______________, which limit the intersection of the object, are installed at the pickets. 4. The horizontal distance from the axis of the crossed object to the axes of the overhead line transition supports is _________________ m. 5. Distance from the nearest overhead line wire ____________________________________ (before crossing Is ______ m. object, wire, rail head, etc.) 6. Measurements were carried out at an ambient temperature of _____________ ° C. Crossing object representative _________________________________________ ___________________________________________________________________________ (name of organization, position, surname, and., o.) Customer representative _______________________ (signature) Assembly representative organization _______________________ (signature) |
8. FORMS OF DOCUMENTS ON EARTHING DEVICES
8.1. The documents on grounding devices include an act of survey of hidden works on the installation of grounding devices and connection to natural grounding devices ().
____________________________________ _________________________________ (Ministry) (city) ____________________________________ _________________________________ (trust) (customer) ____________________________________ _________________________________ (edit control) (object) 200 ___ g (plot) ACT OF INSPECTION OF HIDDEN WORKS ON INSTALLATION OF EARTHING DEVICES Commission consisting of: ___________________________________________________________________________ (position, surname, and., about.) ___________________________________________________________________________ (position, surname, and., about.) made an inspection of the work performed on the installation of grounding devices. Inspection established: 1. The grounding device is made in accordance with the project _____________, (title) developed by _____________________________________________________________ (project organization) according to drawings _______________________________________________________________ (room) 2. Deviation from the project _________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ agreed with ______________________________________________________________ (organization, position, surname, and., about., date) __________________________________________________________________________ and included in the drawings ________________________________________________________ (room) 3. Characteristics of the grounding device. 4. The nature of the connections between the elements of the grounding device and their connection to natural grounding devices ___________________________________________________________________________ ___________________________________________________________________________ 5. Defects are highlighted _____________________________________________________ ___________________________________________________________________________ 6. Conclusion. The grounding device can be covered with earth. Representative of the electrical organization _______________________ (signature) Customer representative _______________________ (signature) |
Application
(Sample cover for the set
technical documentation for the delivery
acceptance of electrical work)
Instructions for drawing up acceptance documents for electrical work covers the types of work that are subject to the requirements of SNiP 3.05.06-85 "Electrical devices", in terms of electrical installations and electrical networks with voltages up to 35 kV inclusive, performed by organizations of the USSR Ministry of Montazhspetsstroy:
Instructions for drawing up acceptance documents for electrical installation work were developed by the All-Union State Research and Design Institute VNIIProektelektromontazh of the Ministry of Installation and Special Construction Works of the USSR.
1.2. Unified forms of acceptance documentation cover all types of electrical installation work, which are subject to the requirements of SNiP 3.05.06-85 "Electrical devices" and the restrictions introduced by order of the Ministry of Montazhspetsstroy N 200 dated 06.19.85 - on the procedure for performing certain types of installation and special construction works in accordance with the profile of the organizations of the Ministry.
** Acceptance documentation for the installation of contact networks is determined by the requirements of the "Instructions for the installation of contact networks for industrial and urban electrified transport" VSN 13-77 / ММССС USSR.
1.3. Comprehensive acceptance of equipment as a whole, including electrical equipment, is carried out by a working commission appointed by the customer (developer), while an act of the working commission is drawn up on the acceptance of equipment after an individual test (Appendix 1 to SNiP 3.01.04-87).
The act formalizes the transfer to the customer of the equipment of the entire facility or for individual installations at large and complex facilities. The act also verifies that the equipment meets the acceptance requirements for its comprehensive testing.
1.4. According to clause 16 of SNiP 3.01.04-87, detached buildings and structures, built-in or attached premises for production and auxiliary purposes, if it is necessary to put them into operation during the construction of an object, are taken into operation by working commissions as soon as they are ready, followed by their presentation to the State Acceptance Commission hosting the object as a whole.
1.5. The readiness of the completed electrical work for acceptance is determined by the act of technical readiness of electrical work (Form 2), which is the basis for organizing the work of the working commission for the acceptance of equipment after individual tests. The act of technical readiness can be used to formalize the delivery and acceptance of electrical work, when the working commission has not yet been formed.
1.6. Completed forms of acceptance documentation as part of all technical documentation listed in form 1, after issuing an act of technical readiness for electrical work (form 2), are transferred to the general contractor for subsequent presentation to the working commission for the acceptance of equipment after individual tests; upon completion of the work of the commission and drawing up the corresponding act, the completed documentation, together with the electrical equipment, is transferred to the customer.
Documentation on commissioning works is presented to the commissions for the acceptance of equipment after individual tests and when drawing up an Act of technical readiness for electrical work. The documentation is kept by the customer or the commissioning organization.
1.7. The composition of the electrical equipment of electrical installations, drawn up by acts of technical readiness for electrical work, depends on specific conditions and can be determined, for example:
The boundaries of the design brand or the main set of working drawings of working documentation (electrical substations - EP, electric lighting - EO, power electrical equipment - EM, etc.);
The boundaries of the shop, built-in, attached and detached premises and structures (power supply of temperature and humidity systems - TVR, electrical equipment for the premises of welding stations, compressor rooms, etc.);
Electrical rooms, as well as electrical equipment that is part of technological systems (if its installation was carried out by an electrical installation organization).
1.8. Records in the forms of acceptance documents must be clear and clear without blots and erasures. If you need to make changes, you should cross out the unnecessary and make the correct entry next to it.
"norm" - if, when assessing the general condition of the elements of an electrical installation by external examination, the quality of the installation, the operation of mechanical interlocks, the simultaneous closing and opening of contacts, etc. no deviations;